Welcome to FoShan NanHai HeBang Exhibition Equipment Factory!
Homepage | Add to Favorites | Chinese

A completed exhibition booth installation process.

  8-way column system is the most important part of exhibition booth. It was make up of 8-way systems, PVC panels, and aluminumn beams, then connectedby tension locks. After this step, we will going to decorate our exhibition according to customer's requirement, and offer the exhibition furnitures and 

lighting settings. That's a completed exhibition booth installation process.
 
Now, we offer 4 step of exhibition booth installation afer 10 years experiences.
 
1.Insert tension lock into the beam. 
 
2.Put the beam and 8-way column system together follow the assembly drawing, then tighten the tension lock with wrench. 
 
3.Test the beam and 8-way column if really tighten.
 
4.Put the PVC panel into the slots.
 
Follow and repeat these steps according assembly drawing, we will finish the job easily.
  • Home
  • Products
  • About
  • News
  • Projects
  • Factory Video
  • Contaction